Download
full Significant Customers List
Southwest Processors
4120 Bandini Blvd.
Los Angeles, CA 90023
Phone: 213-269-9876
|
Size:
$680,000.00
Type: 300 gpm system.
Industry: Central Waste Processing Plant
Project Engineer: Jeff Jerome
Project Completed: September 1987 |
|
HEI designed and installed a system to remove oil &
grease and suspended solids from this non-hazardous central
collection facility. The equipment includes an HEI 300 gpm
CPI oil water separator, 1,000 sq. ft. HEI inclined plate
clarifier, and two (2) HEI 60 cu. ft. filter presses.
» Back
to Significant Customers List